PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Started installing rebar at Elev. 4-Stair -2 Facing South-West (800x600).jpg Welding beam connections at Monumental Stairs column Facing South -2 (800x600).jpg Welding beam connections at Monumental Stairs column Facing South (800x600).jpg Conduit by the Administration building (800x600).jpg Excavating at Rahway Ave. for the underground Tele-Data Facing the Administration Building (800x600).jpg Installed manhole by the administration building (800x600).jpg Installing a manhole at Rahway Ave. Facing the new Court Building (800x600).jpg Installing conduit into the manhole Facing the Administration Building (800x600).jpg Pouring concrete at Elev. 1,2,3 (3rd Floor) Facing West (800x600).jpg
Previous pageNext page Excavating at Rahway Ave. for the underground Tele-Data Facing the Administration Building (800x600)
Excavating at Rahway Ave. for the underground Tele-Data Facing the Administration Building (800x600)